Bremerton Naval Air Station Modular MRI

MRI

Bremerton Naval Air Station Modular MRI
Bremerton, WA

Delivery Method: Design Build

Completion Date: 2010 August

Furnished and installed new modular building and all associated interior improvements for housing Philips Achieva Pulsar 1.5T MRI. Installed structural support with new concrete foundation for modular building footprint, including new ADA-compliant ramp with handrails. Provided new chiller pad. Installed new fire protection system, which is tied into the existing fire alarm system. Mechanical work included fire sprinkler line to modular building as well as pre-piping connections to site water and waste and domestic cold water from main hospital. Electrical work included upgraded power distribution to support equipment as well as new lighting and installation of power to stand-alone HVAC system.

Print Project Profile (PDF)